94. The following activities connected with the production, transformation and storage of electricity require authorization pursuant to subparagraph 10 of the first paragraph of section 22 of the Act:
(1)  the construction and subsequent operation of
(a)  an electric power control or transformer station or an electricity storage system;
(b)  a wind farm or wind generator;
(c)  a solar energy facility;
(d)  a power station burning fossil fuels;
(e)  a hydroelectric power station;
(2)  the relocation of an electric power control or transformer station or an electricity storage system;
(3)  an increase in the power of a wind farm, facility or power station referred to in one of subparagraphs b to e of paragraph 1.
O.C. 871-2020, s. 94.
In force: 2020-12-31
94. The following activities connected with the production, transformation and storage of electricity require authorization pursuant to subparagraph 10 of the first paragraph of section 22 of the Act:
(1)  the construction and subsequent operation of
(a)  an electric power control or transformer station or an electricity storage system;
(b)  a wind farm or wind generator;
(c)  a solar energy facility;
(d)  a power station burning fossil fuels;
(e)  a hydroelectric power station;
(2)  the relocation of an electric power control or transformer station or an electricity storage system;
(3)  an increase in the power of a wind farm, facility or power station referred to in one of subparagraphs b to e of paragraph 1.
O.C. 871-2020, s. 94.